A partial road closure comes into effect on Abu Dhabi's Maqta Bridge from early Tuesday morning.
The Integrated Transport Centre (ITC) posted on its social media platforms that the left-most lanes in both directions on the E22 will be closed from 5.30 am July 12, until 5.30 am on Saturday, July 16.
The ITC is urging motorists to drive carefully and abide by all traffic regulations.
إغلاق جزئي على جسر المقطع - أبــوظبي
— أبوظبي للتنقل | AD Mobility (@ad_mobility) July 11, 2022
من الثلاثاء 12 يوليو 2022 إلى السبت 16 يوليو 2022
Partial Road Closure on Al Maqta Bridge - Abu Dhabi From Tuesday, 12 July 2022 to Saturday, 16 July 2022 pic.twitter.com/IcGvDzUosZ


UAE President meets delegations at Russia‑Ukraine‑US talks
Sheikh Abdullah bin Zayed hails UAE role in Russia‑Ukraine‑US talks
Major infrastructure projects completed in Al Quoz Creative Zone
UAE joins GCC security drill in Qatar
MBRGI backs UNICEF measles vaccination drive for 1 million children